Wadi Gaza Wastewater Treatment Plant and Pump Station

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Palestine 60.000 m3

Scope of Works
- Supply and Installation of MV Panels and Transformers;
- Supply and Installation of All Electrical Equipment
- All Electrical Field Studies and Engineering
- 35 pieces of 24kV 21kA MV Cells
- 11 pcs Power transformers
- Production of 5 pieces. Main Distribution Board, 3 units. Compensation, 7 units. MM and 7 units. PLC Panels.
- Setting up SCADA and automation system;
- 5000 IO System
Computerized maintenance management system (CMMS)
- 3 power management. 1625kVA CHP Gas Generators and 3MW Solar PV Systems
- Tests and Commissioning