Power of the Projects (kWp)
Annual Energy Production (kWh)
Household Consumption Provision
Number of
Panels Used
Amount of Carbon Emissions Avoided
Commissioning
Date
Palestine 60.000 m3
Scope of Works
- Supply and Installation of MV Panels and Transformers;
- Supply and Installation of All Electrical Equipment
- All Electrical Field Studies and Engineering
- 35 pieces of 24kV 21kA MV Cells
- 11 pcs Power transformers
- Production of 5 pieces. Main Distribution Board, 3 units. Compensation, 7 units. MM and 7 units. PLC Panels.
- Setting up SCADA and automation system;
- 5000 IO System
Computerized maintenance management system (CMMS)
- 3 power management. 1625kVA CHP Gas Generators and 3MW Solar PV Systems
- Tests and Commissioning