Tunçbilek Thermal Power Plant Ash Storage System Electrical and Automation Project

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Turkey


365 MW



Scope of Works


- Supplying Transformers, MV, LV Panels, Cables, Lightning - Grounding, MCC, PLC, Busbars, Fire Protection - Installation of all Electrical equipments - SIMATIC PCS 7 Scada System - Software and Hardware Engineering - Training - Approvals of Project Documents at TEİAŞ - Test and Commissioning