Tayasir Wastewater Treatment Plant

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Palestine


The EU and The Palestinian Water Authority Project



Scope of Works


- Supply and Installation of MV Panels and Transformers - Production of all MDP, MCCs, PLCs - All Electrical Site Works and Engineering - Earthing, Cabling, Installation of Cable Trays, Outdoor Lighting - Installation of SCADA and Automation System, 4 pcs ABB AC500 PLCs - ABB Compact HMI SCADA System, 1500 hardwired I/Os - Tests: Pre-operational Checkouts, Functional Testing, Start-up Testing, Reliability Testing - Commissioning, Training and Documentation