TR EN RU
YEO

Seymen Landfill Gas Power Plant Substation

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Turkey


154 kV Substation



Scope of Works


- Primary & Secondary Design & Technical Consultantancy - Supply of all Electrical Equipment (HV Transformer, HV Switching - Devices, HV Voltage-Current Transformers MV Switchgears and all necessary equipments, Protection and Control Panels, MDB & Mashalling Panels,) - Installation of all Electrical Equipment and Cabling - Energy SCADA System ABB MicroSCADA 9.4 - Software and Hardware Engineering - All approvals of Project Documents at TEİAŞ - Test and Commissioning - Training