Kurtkayasi Wind Power Plant Substation Automation

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Turkey


154 kV



Scope of Works


- RTU, Communication and SCADA Panel - All Control and Automation Panels E-plan Design - ABB RTU560 IEC101 with TEİAS National Control Center Communication - ABB MicroSCADA IEC 61850 Communication - Test, Commissioning and Trainings - Wind Monitoring and Forecasting System