Kasımlar Hydroelectric Power Plant Substation Automation

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Turkey


154 kV



Scope of Works


-HV Relay Protection and Control Panels, RTU and Communication Panels, LV Distribution Panel -HV Relay configuration and parameterization, Relay Coordination Analysis, All Protection and Control Panels, E-plan Design -ABB Relion 650 and 670 Series Relays and BCU, MV ABB REF615 Relays -ABB RTU560, IEC101 with TEIAS National Control Center Communication -ABB MicroSCADA, IEC 61850 Communication