Wadi Arab Water System Phase II

Projenin Gücü Power of the Projects (kWp)
Yıllık Enerji Üretimi Annual Energy Production (kWh)
Hane Tüketim Karşılığı Household Consumption Provision
Kullanılan Panel Sayısı Number of
Panels Used
Engellenen Karbon Emisyon Miktarı Amount of Carbon Emissions Avoided
Devreye Alınma Tarihi Commissioning
Date
Jordan


25.000 m³/day located 140 km to the north of Amman



Scope of Works


- Supply and Installation of MV Panels, MV Softstarters and Transformers - 64 pcs. ABB ZS1 12kV 50kA MV Switchgears - 18 pcs. Allen Bradley SMCFlex MV Softstarters - Sonmez STS Transformers - Production of all MDP, MCCs, PLCs - All Electrical Site Works and Engineering - Earthing, Lighting, Cabling, Installation of Cable Trays, Outdoor Lighting, CCTV, Fire Protection Systems - Installation of SCADA and Automation System - 30 pcs Rockwell ControlLogix and CompactLogix PLCs - Rockwell Factory Talk Redundant SCADA System, Rockwell Historian Server, Win911 Alarm Notification System - 4000 hardwired I/Os 2000 soft I/Os - Tests: Pre-operational Checkouts, Functional Testing, Start-up Testing, Reliability Testing - Commissioning, Training and Documentation